EVs & Clean Energy
Alpitronic to Open $34 Million EV Fast‑Charger Factory in South Carolina, Production Expected Early 2027
· GlobeWire Daily Editorial Desk · Source: insideevs.com

Summary
Alpitronic, the Italian maker of high‑power DC fast chargers used by brands such as Walmart, Mercedes‑Benz and BP Pulse, announced a new 173,315‑sq‑ft manufacturing plant in Fort Mill, South Carolina. The $33.94 million facility will assemble 400‑kW and 1,000‑kW charger stalls, host a testing lab, repair centre, logistics hub and warehouse, and create about 70 jobs. Production is slated to begin in early 2027.
Confirmed Details
- Location & Size: Fort Mill, South Carolina; 173,315 sq ft.
- Investment: $33.94 million total, including a $200,000 grant from York County’s Coordinating Council for Economic Development.
- Products: HYC400 (400 kW all‑in‑one stall) and HYC1000 (1,000 kW cabinet with up to four stalls, each delivering up to 600 kW).
- Technology: Silicon‑carbide (SiC) components delivering 97.5 % efficiency, reducing energy loss and operating noise.
- Jobs: Approximately 70 new positions.
- Timeline: Facility expected to be operational in February 2027, with first production runs in early 2027.
- Leadership Quote: Patrik Herrnegger, Alpitronic Americas CEO, said the plant will put U.S. production under direct control and improve service to customers.
Reported Context
- Alpitronic previously relied on a third‑party partner for a Wisconsin assembly line opened in 2024. The new South Carolina plant marks the company’s first wholly‑owned U.S. manufacturing operation.
- Existing U.S. customers include Electrify America, Ionna, Walmart, Mercedes‑Benz and BP Pulse, all of which have begun installing Alpitronic’s 400‑kW stalls.
Practical Implications
- For EV owners: Higher‑efficiency chargers could lower the cost per kilowatt‑hour and reduce charging time due to the high power output.
- For installers and fleet operators: On‑site U.S. production may shorten lead times and simplify logistics.
- Verification: The announcement can be cross‑checked on Alpitronic’s corporate newsroom and the York County economic‑development grant listings.
Unknowns & Risks
- Exact pricing for the HYC400 and HYC1000 systems remains undisclosed.
- The timeline could shift if supply‑chain constraints affect silicon‑carbide component availability.
- No public information on whether the plant will expand beyond the initial 70 jobs.
--- *Source: InsideEVs article dated 2024‑10‑xx (unverified excerpt).
Share this article
Read the original source The EV Charging Company That’s Quietly Conquering America Is Building A New U.S. Factory

