Imphal Municipal Corporation Issues Building Bye-Laws 2nd Amendment 2022 for Online Approvals and EV Infrastructure
· GlobeWire Daily Editorial Desk · Source: tpmanipur.mn.gov.in

The State Government has notified the Imphal Municipal Corporation Building Bye-Laws (2nd Amendment), 2022, introducing digital building permission workflows, revised commercial and institutional setbacks, and mandatory Electric Vehicle Charging Infrastructure (EVCI) standards across the Imphal Municipal Corporation area.
According to the official notification published by the Town Planning Department, Manipur, the amendments aim to streamline building approvals and integrate modern urban mobility needs into municipal planning.
Online Building Permission System (OBPS)
All building applications within the municipal area must now be submitted through Licensed Technical Persons (LTPs) registered with the Imphal Municipal Corporation:
- LTPs must verify site conditions and submit proposals online via AutoCAD building plans and required documentation.
- The OBPS platform auto-scrutinizes proposals against building bye-laws and the Master Plan for Greater Imphal, generating fee challans where compliant.
- Instant Planning and Building Permits along with approved drawings are auto-generated upon fee payment and dispatched to the LTP and applicant via SMS and email.
- Non-compliant proposals are returned with detailed notifications, while authorities retain provisions for post-approval inspections and occupancy certificate issuance.
Development Controls and Setbacks
- Commercial and Mixed-Use Buildings: Specific plot-wise height, ground coverage, and setback parameters have been established for areas outside the Bazar Area. For instance, plots ranging from 90 to 150 square meters permit a maximum height of G+2 (11 meters) with front setbacks of 1.50 meters and rear/side setbacks of 0.90 meters.
- Bazar Area: Existing regulations remain active, permitting a maximum ground coverage of 80%, a Floor Area Ratio (FAR) of 300, a 6-feet front arcade, 2-feet 6-inches side setbacks, and 5-feet rear setbacks.
- Institutional and Educational Buildings: Setback grids and height limits are defined based on plot tiers ranging from 750 square meters to above 1,500 square meters.
Electric Vehicle Charging Infrastructure (EVCI)
New building premises must integrate EV charging capacity for at least 20% of their total parking capacity, backed by enhanced power load sanctions with a safety factor of 1.25:
- Residential Buildings: Private domestic metering supports slow chargers based on owner requirements.
- Commercial and Group Housing: Public Charging Stations (PCS) must adhere to Ministry of Power guidelines dated December 14, 2018, providing specified ratios for 2-wheelers, 3-wheelers, 4-wheelers, and buses.
Verification and Official Notice
- Issuing Authority: Town Planning Department, Government of Manipur / Imphal Municipal Corporation.
- Jurisdiction: Imphal Municipal Corporation Area.
- Official Gazette Notification: Imphal Municipal Corporation Building Bye-Laws (2nd Amendment), 2022.
- Official Notice Link: Town Planning Manipur Portal



