India News

Basti News: 700-Meter-Long Drain Construction Begins to Resolve Waterlogging in Bankati

· GlobeWire Daily Editorial Desk · Source: www.amarujala.com

2 min read

Key takeawaysConstruction has officially commenced on a 700-meter-long drain in the Patel Nagar ward of Bankati Nagar Panchayat, estimated to cost one crore rupees, aimed at resolving long-standing waterlogging issues.
Basti News: जलभराव की समस्या होगी दूर           बनेगा 700 मीटर लंबा नाला

Image: Amar Ujala · Photo source · Resized and letterboxed to 16:9; no AI generation

Construction has officially commenced on a 700-meter-long drain in the Patel Nagar ward of Bankati Nagar Panchayat, estimated to cost one crore rupees, aimed at resolving long-standing waterlogging issues.

According to reports, the foundation stone laying ceremony and inauguration of the construction work took place on Tuesday. The project spans from the Rahul Ganga culvert to the Dhusnakhor turn.

Key Details of the Project

  • Estimated Cost: One crore rupees
  • Length: 700 meters
  • Location: Patel Nagar ward, Bankati Nagar Panchayat (Basti district, Uttar Pradesh)
  • Route: Rahul Ganga culvert to Dhusnakhor turn

Inauguration and Officials Present

The project was inaugurated through traditional worship and breaking of a coconut by Nagar Panchayat President Representative Arvind Pal, former MLA Ravi Sonkar, and block pramukh representative Ramayan Raghunath Singh.

Speaking at the event, Arvind Pal stated that resolving basic infrastructure problems in the area is a top priority.

Expected Benefits and Public Response

Reportedly, the drainage system improvements along the Basti-Mahuli road are expected to strengthen drainage capacity across several wards, including:

  • Deisar
  • Bankati
  • Barohiya

Local residents have expressed happiness over the initiation of the drain construction. Several local figures were present during the ceremony, including Pramod उपाध्याय, Ravichand Pandey, Baburam Chaudhary, Shyam Sundar Chaudhary, Chhote Pal, Vikas Agrahari, Shashi Gaur, Vivekanand Shukla, Kaushal Chaudhary, and Ramkishun Chaudhary.

Readers are advised to verify official local administration announcements regarding project timelines and completion schedules directly through the Bankati Nagar Panchayat office.

Share this article
Read the original source: Basti News: जलभराव की समस्या होगी दूर बनेगा 700 मीटर लंबा नाला

AI-assisted reporting; source claims are attributed and have not been independently verified.

About the author

GlobeWire Daily Editorial Desk — AI-assisted news based on attributed published sources.

More to read