Space & Astronomy

NASA Calls for Industry Partners to Build First Lunar Nuclear Reactor (LR‑1) by 2030

·

2 min read

NASA Calls for Industry Partners to Build First Lunar Nuclear Reactor (LR‑1) by 2030
NASA · resized and padded · Photo source

What’s changing?

NASA has issued a formal Request for Proposals (RFP) seeking U.S. industry partners to design, build and test Lunar Reactor‑1 (LR‑1) – a 20‑kilowatt fission power system intended to supply continuous electricity on the Moon.

Key details

  • Power output: 20 kW (roughly the annual electricity use of 16 U.S. homes).
  • Planned launch: 2030, with a minimum five‑year operational life on the lunar surface.
  • Location of use: Future habitats, communications, rovers, scientific instruments and other infrastructure where sunlight is scarce, especially during the Moon’s ~14‑day night.
  • Safety standards: Must meet Department of Energy (DOE) nuclear‑safety requirements.
  • Proposal deadline: 21 December 2024.

Why nuclear, not solar?

Solar panels on the Moon work only when the Sun shines, which is half the time. A fission reactor can generate power continuously, eliminating the need for large battery banks and enabling operations in permanently shadowed craters or polar regions.

Program context

  • The LR‑1 effort is managed by NASA’s Space Reactors Division in partnership with the DOE.
  • It follows an earlier draft RFP released in August and an industry‑day workshop held in September at the Ohio Aerospace Institute.
  • NASA may award additional task orders for other space‑nuclear concepts, such as the Space Reactor‑1 (SR‑1) Freedom slated for a 2028 launch to power three SkyFall helicopters on Mars.

Practical next steps for interested firms

  1. Review the full RFP on NASA’s procurement portal.
  2. Prepare a technical and cost proposal that demonstrates compliance with DOE safety criteria.
  3. Submit by the 21 December deadline.
  4. Successful bidders will enter a development phase that includes ground‑testing and a flight‑qualification campaign before the 2030 launch.

How to verify

The official solicitation is posted on the NASA website under the Space Power and Reactor Capabilities section. The agency also posted a summary video on its YouTube channel and a press release dated 12 October 2024.

--- *This article is based on NASA’s publicly released RFP and statements from program manager Brian Giblin.*

Share this article

About the author

· The GlobeWire Daily desk publishes and corrects English and Hindi news and explainers. Its articles may use AI-assisted drafting or translation.

More to read